Guru Nanak Nishkam Sewak Jatha
To start off this March we had 200 meters of ducting to install at Guru Nanak Nishkam Sewak Jatha Sikh Temple in Beeston, thanks to C.M.G. Construction and Plant Hire.
We are a small company that deals with all aspects of groundworks in Leeds and the surrounding areas.
Using the knowledge and experience that we have gained over a 25 year period in the construction industry, we take pride in providing a service of high standard, ensuring that our work is carried out swiftly and safely, with minimal disruption to the nature and landscaping around a property.
Every effort is made to put our clients minds at ease regarding any concerns they may have with their project before works commence as we know how daunting the process may seem.
Being the first on a job, we believe in sparing a thought for the trades following us, leaving our finished product as easy as possible to proceed from, preventing unnecessary hold ups in progress.
Spreading ourselves thinly is something we have never done, which is why we only take on one job at a time, meaning we will always begin on the agreed date and we will keep returning until a project is completed.
We look forward to working with you!
6 Mar 2026 21:16
To start off this March we had 200 meters of ducting to install at Guru Nanak Nishkam Sewak Jatha Sikh Temple in Beeston, thanks to C.M.G. Construction and Plant Hire.
8 Feb 2026 13:02
For our final job of 2025 we removed the old, broken tarmac car park at Morley Tyres and installed a reinforced concrete slab to make a solid area for the Cranes, wagons and all heavy vehicles to be worked on. Thanks to Swiftmix concrete, who took on the project, for the work! Looking forwards to working with you again in the future.
15 Feb 2026 17:34
Footings for a rear extension and a new garage were needed for this project along with some top water drainage and a land drain for a sodden lawn.
15 Feb 2026 18:50
We installed a 26 by 9 metre reinforced raft and drainage at the White Rose Event Centre for their new kitchens and storage area. Thanks again to C.M.G. Plant hire and Swiftmix Concrete whose details can be found on our homepage.
24 Feb 2026 18:56
This project required us to prep a basement floor for insulating and screeding for what will become three new apartments. In this case, the client was prepared to install the insulation and screed themselves to cut costs.
15 Feb 2026 18:08
The client here needed the garage demolishing and a slab installing for a prefab. Garden room. We also brought electric, water, an internet duct and drainage to the slab from the house.
15 Feb 2026 17:49
The customer on this job needed a raised area in preparation for a sun room with level access to the house. We started by installing footings and building walls to retain the slab. We then poured the slab including a disabled ramp for wheelchair access.
8 Feb 2026 13:38
Conservatory to demolish, footings to dig and pour and installation of top water drainage.
8 Feb 2026 18:21
Footings and drainage installed in Bradford for a side extension. A concrete layer was spread over the ground inside the extension to act as an oversite in order to stop any growth and act as hardstanding, protecting from wet weather for following trades.
8 Feb 2026 20:34
Kirsty, from Arts & Flowers in Crossgates, wanted a concrete floor installing for her new shop where we had previously dug and poured footings for Xgates extensions. All being well, the new shop will open in spring 2026.
8 Feb 2026 19:39
The customer on this project needed a reinforced slab for a rear extension and some new drainage taken through the garden. We did our best to keep and return the lawn to its original condition.
8 Feb 2026 19:02
A drainage diversion and a reinforced slab were needed for an orangery in Boston Spa.
28 Feb 2025 19:27
This project required some underpinning to the rear of the property before installing a slab for a raised patio, after which, we excavated and poured footings, shuttering around existing drainage.
18 Feb 2025 17:55
Completed the footing dig and once it was passed by the building inspector, we could crack on with the concrete pour. Another job ready for D.T. Building!
17 Feb 2025 20:45
A great start made today. The concrete slab that sat where the extension footprint will be has been broken out and removed for collection. The footing is partially dug and all being well, will be finished and poured tomorrow, providing the building inspector is happy with ground conditions.
15 Feb 2025 15:25

Opening Hours
Mon - Fri: 9am - 5pm
Saturday: 10am - 3pm
Sunday: Closed
Phone
Ciarán 075 444 17618
jpcgroundworks@yahoo.com
Socials